Triple

T2831365
Position Surface form Disambiguated ID Type / Status
Subject ASTM C595 E62244 entity
Predicate instanceOf P0 FINISHED
Object construction material specification C2408 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction material specification
Context triple: [ASTM C595, instanceOf, construction material specification]
  • A. construction material
    A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
  • B. materials specification chosen
    A materials specification defines the required types, properties, standards, and quality criteria for materials to be used in a product, component, or construction.
  • C. cement standard
    A cement standard is a defined specification or guideline that establishes the required properties, performance criteria, and testing methods for cement to ensure quality, safety, and consistency in construction applications.
  • D. building material
    A building material is any substance or product used in construction to form, support, protect, or finish the structural and architectural elements of a built environment.
  • E. construction technique
    A construction technique is a specific method or process used to assemble materials and components into a built structure safely, efficiently, and according to design requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c3c39188190955b9c49d98463d8 completed March 6, 2026, 9:50 p.m.
Created at: March 6, 2026, 10:01 p.m.