Triple
T28309604
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Zealand Wars |
E713960
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Māori–Pākehā conflict |
C53867
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Māori–Pākehā conflict Context triple: [New Zealand Wars, instanceOf, Māori–Pākehā conflict]
-
A.
Treaty of Waitangi case
A Treaty of Waitangi case is a legal proceeding or decision that interprets, applies, or enforces the rights, obligations, and principles arising from the Treaty of Waitangi between the Crown and Māori in New Zealand.
-
B.
Mapuche uprising
The Mapuche uprising refers to the series of indigenous rebellions and resistance movements by the Mapuche people against Spanish colonial rule and later Chilean and Argentine state expansion, aimed at defending their autonomy, territory, and cultural identity.
-
C.
Xhosa Wars
The Xhosa Wars were a series of nine frontier conflicts between the Xhosa peoples and European colonists in the Eastern Cape of South Africa from the late 18th to late 19th centuries, driven by competition over land, cattle, and political control.
-
D.
Māori trust
A Māori trust is a legal entity established to manage and protect Māori communal assets, land, and resources for the collective benefit and cultural, social, and economic advancement of its beneficiaries.
-
E.
Xhosa War
The Xhosa War is a historical conflict between the Xhosa people and European colonial powers in South Africa, marked by a series of nine frontier wars from 1779 to 1879 over land, resources, and sovereignty.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efb5256afc8190b9322d25c3ae6320 |
completed | April 27, 2026, 7:12 p.m. |
Created at: April 27, 2026, 11:39 p.m.