Triple

T28273113
Position Surface form Disambiguated ID Type / Status
Subject Twenty-mule teams E712907 entity
Predicate requiredInfrastructure P98326 FINISHED
Object well-constructed desert wagon roads LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: well-constructed desert wagon roads | Statement: [Twenty-mule teams, requiredInfrastructure, well-constructed desert wagon roads]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: requiredInfrastructure
Context triple: [Twenty-mule teams, requiredInfrastructure, well-constructed desert wagon roads]
  • A. requiresInfrastructureManagement
    Indicates that one entity depends on another to provide or perform infrastructure management in order for it to function or be fulfilled.
  • B. infrastructureNeed chosen
    Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
  • C. supportsInfrastructure
    Indicates that one entity provides resources, services, or capabilities that enable the operation, maintenance, or development of another entity’s infrastructure.
  • D. usesInfrastructure
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • E. maintenanceRequirement
    Indicates that an entity is obligated to perform, schedule, or adhere to specific maintenance activities or conditions for another entity or system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efb5216c6881908020dce4aea65381 completed April 27, 2026, 7:12 p.m.
NER Named-entity recognition batch_69fce28d6c3081908bf76f5db63ecf68 completed May 7, 2026, 7:05 p.m.
PD Predicate disambiguation batch_69fce12d2f08819082134b5eb3db6a24 completed May 7, 2026, 6:59 p.m.
Created at: April 27, 2026, 11:18 p.m.