Triple
T2826800
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Disney Skyliner |
E54941
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | gondola lift transportation system |
C1080
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: gondola lift transportation system Context triple: [Disney Skyliner, instanceOf, gondola lift transportation system]
-
A.
cable car system
chosen
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
B.
people mover system
A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
-
C.
cable car pioneer
A cable car pioneer is an innovator who develops, implements, or significantly advances early cable-driven transportation systems for people or goods.
-
D.
automated people mover vehicle
An automated people mover vehicle is a driverless, guided transit vehicle designed to transport passengers along a fixed route within confined areas such as airports, campuses, or urban centers.
-
E.
Ferris wheel
A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab49e100c0819082a40cb797383243 |
completed | March 6, 2026, 9:40 p.m. |
Created at: March 6, 2026, 9:59 p.m.