Triple
T28201840
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Sea Life Centre Bray |
E716904
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | marine wildlife centre |
C3848
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: marine wildlife centre Context triple: [National Sea Life Centre Bray, instanceOf, marine wildlife centre]
-
A.
marine conservation center
A marine conservation center is a facility dedicated to protecting ocean ecosystems through research, education, wildlife rehabilitation, and community engagement.
-
B.
whale watching center
A whale watching center is a facility that organizes and supports whale observation activities, providing tours, educational resources, and viewing infrastructure for visitors.
-
C.
oceanarium
chosen
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
D.
marine park area
A marine park area is a designated ocean or coastal zone managed to conserve marine ecosystems and biodiversity while allowing regulated recreation, education, and sometimes sustainable use.
-
E.
marine animal
A marine animal is a living organism that inhabits saltwater environments, such as oceans and seas, and is adapted to life in or near the water.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b826908190857e6e7dad74ed93 |
completed | April 27, 2026, 9:35 p.m. |
Created at: April 27, 2026, 10:32 p.m.