Triple

T2818786
Position Surface form Disambiguated ID Type / Status
Subject Scotia Arc E54355 entity
Predicate instanceOf P0 FINISHED
Object island arc system C3093 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: island arc system
Context triple: [Scotia Arc, instanceOf, island arc system]
  • A. volcanic arc
    A volcanic arc is a curved chain of volcanoes that forms above a subducting tectonic plate, typically parallel to an oceanic trench, where magma generated by subduction rises to the surface.
  • B. subduction-related volcanic arc chosen
    A subduction-related volcanic arc is a curved chain of volcanoes that forms above a subducting tectonic plate where descending oceanic lithosphere melts and generates magma that rises to the overriding plate.
  • C. subduction zone
    A subduction zone is a tectonic boundary where one lithospheric plate sinks beneath another into the mantle, generating intense seismic activity, volcanism, and mountain building.
  • D. tectonic system
    A tectonic system is the interconnected set of processes and structures through which Earth’s lithospheric plates move, interact, and reshape the planet’s surface over geological time.
  • E. submarine mountain chain
    A submarine mountain chain is a long, continuous series of underwater mountains, typically formed by tectonic plate movements and volcanic activity along the ocean floor.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49de0af08190b3da69683be1e728 completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:59 p.m.