Triple
T28184878
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Diamond face routes |
E716149
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | collection of climbing routes |
C37833
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: collection of climbing routes Context triple: [Diamond face routes, instanceOf, collection of climbing routes]
-
A.
rock climbing route
A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
-
B.
climbing route feature
A climbing route feature is a distinct physical characteristic or structure on a rock face, wall, or artificial surface that influences how a climber moves, grips, or protects the route.
-
C.
mountaineering route collection
chosen
A mountaineering route collection is an organized set of documented climbing routes, typically grouped by region, mountain, or difficulty, used for planning, reference, and comparison by climbers and expedition planners.
-
D.
ridge climb route
A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
-
E.
climbing route destination
A climbing route destination is a specific location or endpoint on a climbing route that climbers aim to reach, often defined by a particular hold, anchor, or ledge.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b4fc5c81909dd88f01a8c2b35d |
completed | April 27, 2026, 9:35 p.m. |
Created at: April 27, 2026, 10:22 p.m.