Triple
T28175198
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hongqiao transport hub |
E715570
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway–airport interchange |
C28624
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway–airport interchange Context triple: [Hongqiao transport hub, instanceOf, railway–airport interchange]
-
A.
railway–metro interchange
A railway–metro interchange is a transport facility where mainline railway services and urban metro lines connect, enabling passengers to transfer conveniently between regional and local rail networks.
-
B.
airport rail station
An airport rail station is a transportation facility that directly connects an airport to regional or long-distance rail networks, enabling passengers to transfer efficiently between air and train travel.
-
C.
transport terminal
A transport terminal is a designated facility where passengers or goods begin, end, or transfer between different modes or routes of transportation.
-
D.
intermodal passenger station
chosen
An intermodal passenger station is a transportation facility where travelers can conveniently transfer between multiple modes of passenger transport, such as trains, buses, trams, and sometimes air or ferry services, within a coordinated hub.
-
E.
passenger rail terminal
A passenger rail terminal is a dedicated facility where travelers board, disembark, and transfer between trains, supported by platforms, ticketing, waiting areas, and related passenger services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b340f0819095680e15dcdc1830 |
completed | April 27, 2026, 9:35 p.m. |
Created at: April 27, 2026, 10:15 p.m.