Triple

T2816588
Position Surface form Disambiguated ID Type / Status
Subject Great Trigonometrical Survey of India E54302 entity
Predicate instanceOf P0 FINISHED
Object geodetic survey C10786 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: geodetic survey
Context triple: [Great Trigonometrical Survey of India, instanceOf, geodetic survey]
  • A. geodetic datum
    A geodetic datum is a reference framework consisting of a defined origin, orientation, and scale used to precisely locate points on the Earth’s surface in terms of latitude, longitude, and elevation.
  • B. land surveying examination
    A land surveying examination is a formal assessment that tests a candidate’s knowledge, skills, and competency in surveying principles, practices, laws, and standards required for professional licensure or certification.
  • C. surveyor
    A surveyor is a professional who measures and maps land, boundaries, and features to provide precise data for construction, engineering, and legal purposes.
  • D. GNSS reference network
    A GNSS reference network is a coordinated system of continuously operating GNSS stations that provide precise, stable positioning and timing references for surveying, navigation, and geospatial applications.
  • E. architectural survey
    An architectural survey is a systematic assessment and documentation of a building or site’s physical condition, design features, and historical or regulatory context to inform planning, preservation, or construction decisions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab49de0af08190b3da69683be1e728 completed March 6, 2026, 9:40 p.m.
Created at: March 6, 2026, 9:59 p.m.