Triple
T28160607
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | El Quimbo Reservoir |
E714880
|
entity |
| Predicate | constructionCaused |
P171784
|
FINISHED |
| Object | relocation of rural populations |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: relocation of rural populations | Statement: [El Quimbo Reservoir, constructionCaused, relocation of rural populations]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: constructionCaused Context triple: [El Quimbo Reservoir, constructionCaused, relocation of rural populations]
-
A.
constructionInterruptedBy
Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
-
B.
causedBuildingCollapse
Indicates that one entity was responsible for bringing about the structural failure or collapse of a building.
-
C.
constructionHalted
Indicates that an ongoing construction activity or project has been stopped or suspended before completion.
-
D.
constructionCompleted
Indicates that a construction process or project has been fully finished and reached its completed state.
-
E.
constructionUsed
Indicates that one entity was employed as a construction method, material, or component in creating or assembling another entity.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b156448190bfa15958208395c3 |
completed | April 27, 2026, 9:35 p.m. |
| NER | Named-entity recognition | batch_69f6a28c7c148190bfc980aad9f678ca |
completed | May 3, 2026, 1:19 a.m. |
| PD | Predicate disambiguation | batch_69f69fe1e3c88190830bb2e9f407357e |
completed | May 3, 2026, 1:07 a.m. |
| PDg | Predicate description generation | batch_69f6a28b8ea881908733485374771c51 |
completed | May 3, 2026, 1:19 a.m. |
Created at: April 27, 2026, 10:06 p.m.