Triple

T28138790
Position Surface form Disambiguated ID Type / Status
Subject East Midlands Electricity Board E714284 entity
Predicate instanceOf P0 FINISHED
Object regional electricity supplier C359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional electricity supplier
Context triple: [East Midlands Electricity Board, instanceOf, regional electricity supplier]
  • A. energy supplier
    An energy supplier is an entity that procures, manages, and delivers electricity and/or gas to consumers, handling contracts, billing, and customer service while interfacing with energy producers and grid operators.
  • B. electric utility chosen
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • C. public utility company
    A public utility company is an organization, often government-regulated, that provides essential services such as electricity, water, gas, or telecommunications to the public, typically operating as a natural monopoly to ensure reliable and widespread access.
  • D. Electricity regulatory commission
    An electricity regulatory commission is a governing body that oversees, regulates, and enforces policies for the generation, transmission, distribution, and pricing of electrical power to ensure reliability, fairness, and consumer protection.
  • E. electricity market region
    An electricity market region is a geographically defined area within which electricity generation, transmission, distribution, and trading are coordinated under a common set of market rules, regulatory frameworks, and grid operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efd6af156c81908f50c2cd7db0e1ef completed April 27, 2026, 9:35 p.m.
Created at: April 27, 2026, 9:51 p.m.