Triple

T28093518
Position Surface form Disambiguated ID Type / Status
Subject Prairie du Sac Dam E710021 entity
Predicate hasPowerPlant P9904 FINISHED
Object Prairie du Sac Hydroelectric Plant
The Prairie du Sac Hydroelectric Plant is a hydroelectric power facility in Wisconsin that generates electricity using water flow from the Prairie du Sac Dam on the Wisconsin River.
E1802322 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Prairie du Sac Hydroelectric Plant | Statement: [Prairie du Sac Dam, hasPowerPlant, Prairie du Sac Hydroelectric Plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Prairie du Sac Hydroelectric Plant
Triple: [Prairie du Sac Dam, hasPowerPlant, Prairie du Sac Hydroelectric Plant]
Generated description
The Prairie du Sac Hydroelectric Plant is a hydroelectric power facility in Wisconsin that generates electricity using water flow from the Prairie du Sac Dam on the Wisconsin River.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef9b70fd108190a875953b2e50ca91 completed April 27, 2026, 5:22 p.m.
NER Named-entity recognition batch_69f6406d517481908e5b24b2f41c585b completed May 2, 2026, 6:20 p.m.
NED1 Entity disambiguation (via context triple) batch_6a15c922092881909eab8cffcb6a1f7f completed May 26, 2026, 4:24 p.m.
NEDg Description generation batch_6a15ca6352088190896197841a36baa7 completed May 26, 2026, 4:29 p.m.
NED2 Entity disambiguation (via description) batch_6a15ccdad0d0819093ee0e177574c96d completed May 26, 2026, 4:39 p.m.
Created at: April 27, 2026, 9 p.m.