Triple
T28076172
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Passante Ferroviario di Milano |
E709548
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | suburban railway link |
C29557
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: suburban railway link Context triple: [Passante Ferroviario di Milano, instanceOf, suburban railway link]
-
A.
suburban railway corridor
chosen
A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
-
B.
suburban railway branch
A suburban railway branch is a secondary rail line that diverges from a main route to serve residential and commuter areas on the outskirts of a city.
-
C.
suburban commuter train
A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
-
D.
urban rail loop line
An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
-
E.
suburban railway group
A suburban railway group is an organization or network that coordinates and operates rail services connecting a central city with its surrounding suburban areas, typically focusing on commuter transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef9b6f8078819098b741274cd1a2ee |
completed | April 27, 2026, 5:22 p.m. |
Created at: April 27, 2026, 8:49 p.m.