Triple
T28067267
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Starship spacecraft |
E709289
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | second stage |
C47791
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: second stage Context triple: [Starship spacecraft, instanceOf, second stage]
-
A.
second division
Second division is a conceptual class representing a secondary or lower-tier level within a hierarchical ranking or league system, typically positioned below the top division.
-
B.
secondary peak
A secondary peak is a smaller, subordinate maximum in a distribution, signal, or function that occurs in addition to the primary (highest) peak.
-
C.
kick stage
chosen
A kick stage is a small, usually expendable rocket stage used after the main launch vehicle to precisely place payloads into their final orbits or trajectories.
-
D.
secondary championship
A secondary championship is a subordinate competitive title or tournament that exists below a primary championship, often providing additional recognition and development opportunities for participants.
-
E.
second wine
A second wine is a high-quality but more accessible wine produced by a prestigious estate using grapes or lots not selected for its flagship (first) wine, often reflecting the same style at a lower price.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef9b6eb6d88190a3fea236eb0f7bed |
completed | April 27, 2026, 5:22 p.m. |
Created at: April 27, 2026, 8:43 p.m.