Triple

T28055842
Position Surface form Disambiguated ID Type / Status
Subject Nisqually Corridor of Mount Rainier National Park E708964 entity
Predicate instanceOf P0 FINISHED
Object access corridor C53726 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: access corridor
Context triple: [Nisqually Corridor of Mount Rainier National Park, instanceOf, access corridor]
  • A. institutional corridor
    An institutional corridor is a long, functional passageway within a formal facility (such as a school, hospital, or government building) that connects rooms and departments while regulating movement and access.
  • B. entrance
    An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
  • C. ceremonial corridor
    A ceremonial corridor is a formal, often architecturally embellished passageway designed to frame and elevate processions, rituals, or symbolic movement through a space.
  • D. neighborhood corridor
    A neighborhood corridor is a linear, mixed-use area within a community that concentrates housing, shops, services, and transportation along a primary street to support walkability and local activity.
  • E. museum corridor
    A museum corridor is a long, connecting passageway within a museum that guides visitors between galleries while often displaying artworks or informational exhibits along its walls.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef9b6df9f48190bbb971d02cbe1b65 completed April 27, 2026, 5:22 p.m.
Created at: April 27, 2026, 8:36 p.m.