Triple
T28016279
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | System Operator of the Unified Power System |
E707552
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | national grid operator |
C27230
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: national grid operator Context triple: [System Operator of the Unified Power System, instanceOf, national grid operator]
-
A.
national grid system
A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
-
B.
regional transmission organization
chosen
A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
-
C.
wholesale electricity market operator
A wholesale electricity market operator is an entity that administers and coordinates the buying and selling of electricity in bulk, ensuring efficient market functioning, system reliability, and fair access for generators and large consumers.
-
D.
Electricity regulatory commission
An electricity regulatory commission is a governing body that oversees, regulates, and enforces policies for the generation, transmission, distribution, and pricing of electrical power to ensure reliability, fairness, and consumer protection.
-
E.
energy supplier
An energy supplier is an entity that procures, manages, and delivers electricity and/or gas to consumers, handling contracts, billing, and customer service while interfacing with energy producers and grid operators.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef96baf3a881909a2b63844185dddd |
completed | April 27, 2026, 5:02 p.m. |
Created at: April 27, 2026, 8:07 p.m.