Triple
T2793759
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jura water correction system |
E61987
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | flood control system |
C5154
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: flood control system Context triple: [Jura water correction system, instanceOf, flood control system]
-
A.
movable flood barrier
A movable flood barrier is a deployable structure designed to be raised or repositioned as needed to temporarily block or redirect water and protect areas from flooding.
-
B.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
C.
water management structure
chosen
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
-
D.
water management project
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
E.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b7f51d881908768300ebd2fbdae |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:58 p.m.