Triple
T2785363
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Master Plan for the Central Delaware |
E61797
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterfront revitalization plan |
C10710
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterfront revitalization plan Context triple: [Master Plan for the Central Delaware, instanceOf, waterfront revitalization plan]
-
A.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
B.
waterfront pier complex
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
C.
water management project
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
D.
water pollution control program
A water pollution control program is an organized set of policies, regulations, monitoring activities, and treatment measures designed to prevent, reduce, and manage contaminants entering water bodies to protect human health and aquatic ecosystems.
-
E.
restored wetland
A restored wetland is a previously degraded or altered wetland area that has been intentionally rehabilitated to recover its natural hydrology, vegetation, and ecological functions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b7f51d881908768300ebd2fbdae |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:57 p.m.