Triple

T2785200
Position Surface form Disambiguated ID Type / Status
Subject Cherry Street Pier E61793 entity
Predicate instanceOf P0 FINISHED
Object redeveloped pier C5954 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: redeveloped pier
Context triple: [Cherry Street Pier, instanceOf, redeveloped pier]
  • A. waterfront pier complex chosen
    A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
  • B. former bridge
    A former bridge is a structure that once functioned as a crossing over an obstacle such as water, a road, or a valley, but has since been decommissioned, repurposed, or rendered unusable for its original bridging purpose.
  • C. seawall
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • D. station redevelopment organization
    A station redevelopment organization is an entity responsible for planning, coordinating, and executing the modernization and transformation of railway or transit stations to improve functionality, accessibility, and surrounding urban environments.
  • E. seaside amusement park
    A seaside amusement park is a recreational venue located along a coast that combines rides, games, food stalls, and entertainment with access to the beach and ocean views.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b7f51d881908768300ebd2fbdae completed March 6, 2026, 9:47 p.m.
Created at: March 6, 2026, 9:57 p.m.