Triple
T2785200
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cherry Street Pier |
E61793
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | redeveloped pier |
C5954
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: redeveloped pier Context triple: [Cherry Street Pier, instanceOf, redeveloped pier]
-
A.
waterfront pier complex
chosen
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
former bridge
A former bridge is a structure that once functioned as a crossing over an obstacle such as water, a road, or a valley, but has since been decommissioned, repurposed, or rendered unusable for its original bridging purpose.
-
C.
seawall
A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
-
D.
station redevelopment organization
A station redevelopment organization is an entity responsible for planning, coordinating, and executing the modernization and transformation of railway or transit stations to improve functionality, accessibility, and surrounding urban environments.
-
E.
seaside amusement park
A seaside amusement park is a recreational venue located along a coast that combines rides, games, food stalls, and entertainment with access to the beach and ocean views.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b7f51d881908768300ebd2fbdae |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:57 p.m.