Triple

T2775171
Position Surface form Disambiguated ID Type / Status
Subject IEEE 802.1Qbh E61550 entity
Predicate instanceOf P0 FINISHED
Object bridge port extension standard C163 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge port extension standard
Context triple: [IEEE 802.1Qbh, instanceOf, bridge port extension standard]
  • A. bridge network
    A bridge network is a system of interconnected bridges and links that provides multiple paths for traffic or data to travel between nodes, enhancing reliability and load distribution.
  • B. bridge approach
    A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
  • C. serial bus interface standard chosen
    A serial bus interface standard defines the electrical, timing, and protocol rules that govern how devices communicate and exchange data over a serial communication bus.
  • D. network connector
    A network connector is a component that establishes, maintains, and manages communication links between devices or systems within a network.
  • E. standardized rail interface
    A standardized rail interface is a uniform physical and electrical connection system that allows different rail vehicles, components, or infrastructure elements to interoperate safely and efficiently across multiple networks or manufacturers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b7cd13481909174bca9809ed259 completed March 6, 2026, 9:47 p.m.
Created at: March 6, 2026, 9:57 p.m.