Triple

T277486
Position Surface form Disambiguated ID Type / Status
Subject Column of Victory E5279 entity
Predicate instanceOf P0 FINISHED
Object stone column C3281 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: stone column
Context triple: [Column of Victory, instanceOf, stone column]
  • A. obelisk
    An obelisk is a tall, four-sided, narrow tapering monument that ends in a pyramid-shaped top, typically carved from a single stone and often erected as a commemorative or ceremonial structure.
  • B. lattice tower
    A lattice tower is a tall, open-framework structure made of intersecting metal or wooden members, designed to support loads such as antennas, power lines, or observation platforms.
  • C. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • D. sandstone temple
    A sandstone temple is a sacred architectural structure built primarily from sandstone, often featuring intricate carvings and weathered, warm-toned surfaces that reflect its historical and cultural significance.
  • E. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a257e6c8788190987dfe705ca2912a completed Feb. 28, 2026, 2:50 a.m.
Created at: Feb. 28, 2026, 2:59 a.m.