Triple
T27705309
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Corsódromo de Gualeguaychú |
E698538
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | parade venue |
C38718
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: parade venue Context triple: [Corsódromo de Gualeguaychú, instanceOf, parade venue]
-
A.
parade event
A parade event is a planned public procession featuring organized groups, performances, and displays moving along a designated route for celebration, commemoration, or entertainment.
-
B.
festival venue
A festival venue is a designated location equipped with the infrastructure, amenities, and spatial layout necessary to host large-scale, often multi-day cultural, musical, or artistic events for public audiences.
-
C.
parade
A parade is a coordinated public procession of people, vehicles, or floats moving along a designated route, typically held to celebrate, commemorate, or promote a particular event, cause, or group.
-
D.
planned parade ground
chosen
A planned parade ground is a deliberately designed open space intended for organized public gatherings, ceremonial marches, and military or civic displays.
-
E.
outdoor entertainment venue
An outdoor entertainment venue is an open-air location designed to host live performances, events, and recreational activities for public audiences.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef590f655c81909f93893b3b3219b2 |
completed | April 27, 2026, 12:39 p.m. |
Created at: April 27, 2026, 2:59 p.m.