Triple

T27699796
Position Surface form Disambiguated ID Type / Status
Subject Harbin West Railway Station E698396 entity
Predicate servedByLine P1293 FINISHED
Object Harbin–Qiqihar Intercity Railway
The Harbin–Qiqihar Intercity Railway is a high-speed rail line in Heilongjiang, China, connecting the major cities of Harbin and Qiqihar to improve regional passenger transport.
E1787907 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Harbin–Qiqihar Intercity Railway | Statement: [Harbin West Railway Station, servedByLine, Harbin–Qiqihar Intercity Railway]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Harbin–Qiqihar Intercity Railway
Triple: [Harbin West Railway Station, servedByLine, Harbin–Qiqihar Intercity Railway]
Generated description
The Harbin–Qiqihar Intercity Railway is a high-speed rail line in Heilongjiang, China, connecting the major cities of Harbin and Qiqihar to improve regional passenger transport.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590ea74081908f0cd7500d85fa27 completed April 27, 2026, 12:39 p.m.
NER Named-entity recognition batch_69f635a29ff08190bfd246ccaf0ddb4e completed May 2, 2026, 5:34 p.m.
NED1 Entity disambiguation (via context triple) batch_6a12eca294808190a0ad1bd6bbf1de76 completed May 24, 2026, 12:18 p.m.
NEDg Description generation batch_6a12ed2afa9481909cc0ca56270ba2a0 completed May 24, 2026, 12:20 p.m.
NED2 Entity disambiguation (via description) batch_6a12edccfe54819094da363072bdf7a6 completed May 24, 2026, 12:23 p.m.
Created at: April 27, 2026, 2:56 p.m.