Triple

T276742
Position Surface form Disambiguated ID Type / Status
Subject Tesla Roadster E5265 entity
Predicate chargingStandard P1048 FINISHED
Object proprietary Tesla connector (first generation) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: proprietary Tesla connector (first generation) | Statement: [Tesla Roadster, chargingStandard, proprietary Tesla connector (first generation)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: chargingStandard
Context triple: [Tesla Roadster, chargingStandard, proprietary Tesla connector (first generation)]
  • A. fastChargingCapability
    Indicates that an entity has the ability to charge at a higher-than-standard power rate, significantly reducing the time needed to reach a usable or full charge.
  • B. onboardACCharger
    Indicates that an entity is equipped with an AC (alternating current) charger that is built into the system or vehicle itself.
  • C. usesElectricityStandard chosen
    Indicates that one entity operates according to, or is compatible with, the electricity supply standard defined or used by another entity.
  • D. hasElectricCharge
    Indicates that an entity possesses a nonzero electric charge as a physical property.
  • E. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a257e6c8788190987dfe705ca2912a completed Feb. 28, 2026, 2:50 a.m.
NER Named-entity recognition batch_69a25ded68c88190b1fc595ce329aeb9 completed Feb. 28, 2026, 3:15 a.m.
PD Predicate disambiguation batch_69a25b7480e881909399beccfc7ffb81 completed Feb. 28, 2026, 3:05 a.m.
Created at: Feb. 28, 2026, 2:59 a.m.