Triple

T27656153
Position Surface form Disambiguated ID Type / Status
Subject Brooklyn-Queens Expressway triple cantilever structure E696997 entity
Predicate instanceOf P0 FINISHED
Object cantilever bridge-like structure C2689 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cantilever bridge-like structure
Context triple: [Brooklyn-Queens Expressway triple cantilever structure, instanceOf, cantilever bridge-like structure]
  • A. cantilever bridge chosen
    A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
  • B. cable-stayed bridge
    A cable-stayed bridge is a type of bridge in which the deck is directly supported by multiple cables connected to one or more towers or pylons, efficiently distributing loads and allowing for long spans with a distinctive, fan-like or harp-like appearance.
  • C. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • D. bridge structure
    A bridge structure is an engineered construction that spans physical obstacles such as water, valleys, or roads to provide a stable pathway for transportation or movement.
  • E. beam bridge
    A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590abd3c8190834d0193bde12007 completed April 27, 2026, 12:39 p.m.
Created at: April 27, 2026, 2:34 p.m.