Triple

T27655273
Position Surface form Disambiguated ID Type / Status
Subject Pressurized Mating Adapter E696975 entity
Predicate instanceOf P0 FINISHED
Object spacecraft docking system component C10281 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: spacecraft docking system component
Context triple: [Pressurized Mating Adapter, instanceOf, spacecraft docking system component]
  • A. spacecraft docking system chosen
    A spacecraft docking system is a coordinated assembly of mechanical interfaces, sensors, and control software that enables two spacecraft to safely approach, align, and connect in orbit for transfer of crew, cargo, or resources.
  • B. spacecraft berthing mechanism
    A spacecraft berthing mechanism is a structural and mechanical interface system that enables two spacecraft or modules to be precisely aligned, securely joined, and later separated while maintaining required load paths and connections for power, data, and environmental control.
  • C. space launch vehicle component
    A space launch vehicle component is a physical subsystem or part—such as engines, tanks, avionics, or structural elements—that contributes to the propulsion, guidance, structural integrity, or support functions required to deliver payloads from Earth to space.
  • D. spacecraft service module
    A spacecraft service module is the section of a spacecraft that houses and provides essential support systems—such as propulsion, power, thermal control, and consumables—to enable and sustain the operation of the crew or payload module.
  • E. modular spacecraft
    A modular spacecraft is a reconfigurable space vehicle composed of interchangeable, standardized modules that can be assembled, upgraded, or replaced to support different missions and functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef590abd3c8190834d0193bde12007 completed April 27, 2026, 12:39 p.m.
Created at: April 27, 2026, 2:34 p.m.