Triple
T27613151
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Outlook JavaScript API |
E700374
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | web add-in API |
C18777
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: web add-in API Context triple: [Outlook JavaScript API, instanceOf, web add-in API]
-
A.
SharePoint feature
A SharePoint feature is a modular, deployable package of functionality that can be activated or deactivated to extend and customize SharePoint sites, lists, and behaviors.
-
B.
office development
Office development is the process of planning, designing, constructing, and managing buildings and complexes intended primarily for business, administrative, and professional work activities.
-
C.
SharePoint Server 2016 feature pack
SharePoint Server 2016 Feature Pack is a cumulative set of updates and enhancements that extend the functionality, security, and hybrid capabilities of SharePoint Server 2016 beyond its original release.
-
D.
Adobe Creative Cloud extension
An Adobe Creative Cloud extension is a software add-on that integrates directly into Adobe applications to enhance or automate creative workflows with additional tools, panels, or services.
-
E.
browser API
chosen
A browser API is a set of standardized interfaces provided by a web browser that allow web pages and applications to interact with browser features, the underlying device, and external resources in a controlled way.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef6a4f1d9c8190b0705acda054368d |
completed | April 27, 2026, 1:53 p.m. |
Created at: April 27, 2026, 2:11 p.m.