Triple
T27569729
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gokyo Ri |
E695999
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | trekking peak |
C30
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: trekking peak Context triple: [Gokyo Ri, instanceOf, trekking peak]
-
A.
mountain
chosen
A mountain is a large natural elevation of the Earth's surface rising prominently above its surroundings, typically with steep sides and a significant height relative to nearby terrain.
-
B.
mountain trail
A mountain trail is a marked or worn path through mountainous terrain designed for hiking, climbing, or traversing varying elevations and natural features.
-
C.
peak-bagging program
A peak-bagging program is a structured plan or software tool that helps climbers systematically identify, track, and complete ascents of specific lists of summits or high points.
-
D.
mountaineering expedition
A mountaineering expedition is an organized journey by a team to plan, approach, and ascend challenging mountain terrain, managing technical, environmental, and logistical risks to reach specific climbing objectives.
-
E.
climbing landmark
A climbing landmark is a notable natural or artificial feature, such as a cliff, peak, or structure, that serves as a recognized destination or reference point for climbers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef53891af88190a193c5e2a1dac9b1 |
completed | April 27, 2026, 12:16 p.m. |
Created at: April 27, 2026, 1:42 p.m.