Triple
T2752983
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | L’Enfant Plan for Washington, D.C. |
E61031
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planning document |
C7550
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planning document Context triple: [L’Enfant Plan for Washington, D.C., instanceOf, planning document]
-
A.
military planning document
A military planning document is a formal written plan that outlines objectives, strategies, resources, timelines, and contingencies for conducting military operations or activities.
-
B.
planning library
A planning library is a reusable collection of algorithms, data structures, and tools that support the creation, evaluation, and optimization of plans or schedules within software applications.
-
C.
long-term plan
chosen
A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
-
D.
planning school
A planning school is an educational institution or academic program focused on teaching the theories, methods, and practices of urban and regional planning to prepare professionals for shaping the built and natural environment.
-
E.
founding document
A founding document is an authoritative text that formally establishes an organization, institution, or state by defining its core principles, structure, and governing rules.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b7a85bc819094a349b84beb1f2c |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:56 p.m.