Triple

T2747402
Position Surface form Disambiguated ID Type / Status
Subject Central Scotland E60901 entity
Predicate traversedBy P225 FINISHED
Object M8 motorway E8866 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M8 motorway | Statement: [Central Scotland, traversedBy, M8 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M8 motorway
Context triple: [Central Scotland, traversedBy, M8 motorway]
  • A. M8 motorway chosen
    The M8 motorway is a major Scottish highway linking the cities of Glasgow and Edinburgh and serving as a key east–west transport corridor across the Central Belt.
  • B. M7 motorway
    The M7 motorway is a major Hungarian highway that links Budapest with Lake Balaton and continues toward the Croatian border, serving as a key route in southwestern Hungary.
  • C. M9 motorway
    The M9 motorway is a major Scottish highway connecting Edinburgh to Stirling and the Highlands, serving as a key transport route through central Scotland.
  • D. M11 motorway
    The M11 motorway is a major road in England connecting London to Cambridge and serving as a key route for traffic between the capital, East Anglia, and the Midlands via the A14.
  • E. M6 motorway
    The M6 motorway is a major north–south route in England, running from the Midlands to the Scottish border and serving as a key part of the UK’s strategic road network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4b79846081909096725374d65ce9 completed March 6, 2026, 9:47 p.m.
NER Named-entity recognition batch_69abdb4ff7b08190b72edb6a2bc5fd19 completed March 7, 2026, 8:01 a.m.
NED1 Entity disambiguation (via context triple) batch_69bfe1423aa481909fd062c54779a3a2 completed March 22, 2026, 12:32 p.m.
Created at: March 6, 2026, 9:56 p.m.