Triple
T2746741
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | STEREO mission |
E60887
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | solar observatory mission |
C8801
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: solar observatory mission Context triple: [STEREO mission, instanceOf, solar observatory mission]
-
A.
observatory
An observatory is a facility equipped with specialized instruments and structures designed for systematically observing and recording natural phenomena, typically in astronomy or atmospheric science.
-
B.
space mission
chosen
A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
-
C.
astronomical observatory
An astronomical observatory is a facility equipped with specialized instruments and structures designed to observe, record, and analyze celestial objects and phenomena.
-
D.
NASA mission component
A NASA mission component is a distinct hardware, software, or operational element designed to perform a specific function that contributes to the overall objectives and success of a NASA space mission.
-
E.
observational astronomy project
An observational astronomy project is a structured scientific endeavor that uses telescopes and instruments to collect, analyze, and interpret data from celestial objects and phenomena.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b79846081909096725374d65ce9 |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:56 p.m.