Triple
T27456653
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shibaura-futō Station |
E692613
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | automated guideway transit station |
C52811
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: automated guideway transit station Context triple: [Shibaura-futō Station, instanceOf, automated guideway transit station]
-
A.
automated guideway transit line
An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
-
B.
automated people mover vehicle
An automated people mover vehicle is a driverless, guided transit vehicle designed to transport passengers along a fixed route within confined areas such as airports, campuses, or urban centers.
-
C.
monorail station
A monorail station is a designated facility where passengers board, alight, and transfer to monorail trains, typically featuring elevated platforms, access structures, and passenger amenities.
-
D.
rapid transit station
A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
-
E.
light-rail station
A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef5207903881909427745cda05d27a |
completed | April 27, 2026, 12:09 p.m. |
Created at: April 27, 2026, 12:49 p.m.