Triple
T273721
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rolf Frick |
E5200
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | German engineer |
C3253
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: German engineer Context triple: [Rolf Frick, instanceOf, German engineer]
-
A.
civil engineer
A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
-
B.
architect
An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
-
C.
mathematician
A mathematician is a person who studies, formulates, and analyzes abstract structures, patterns, and relationships using logical reasoning and symbolic methods.
-
D.
biochemical engineer
A biochemical engineer is a professional who applies principles of biology, chemistry, and engineering to design, optimize, and scale processes for producing biological products such as pharmaceuticals, biofuels, and food ingredients.
-
E.
chemical engineer
A chemical engineer is a professional who applies principles of chemistry, physics, mathematics, and engineering to design, optimize, and operate processes that transform raw materials into useful products safely, efficiently, and sustainably.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a257e6c8788190987dfe705ca2912a |
completed | Feb. 28, 2026, 2:50 a.m. |
Created at: Feb. 28, 2026, 2:59 a.m.