Triple

T27364552
Position Surface form Disambiguated ID Type / Status
Subject King George V Bridge, Glasgow E690119 entity
Predicate instanceOf P0 FINISHED
Object steel and concrete bridge C52758 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: steel and concrete bridge
Context triple: [King George V Bridge, Glasgow, instanceOf, steel and concrete bridge]
  • A. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
  • B. concrete bridge
    A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
  • C. reinforced-concrete bridge
    A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
  • D. reinforced-concrete bridge
    A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely span obstacles and carry traffic loads over a defined distance.
  • E. cast-iron bridge
    A cast-iron bridge is a structure whose primary load-bearing elements are made from cast iron, typically featuring modular, prefabricated components assembled to span a gap such as a river or roadway.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef51ff826081909e42c8e2bfb97941 completed April 27, 2026, 12:09 p.m.
Created at: April 27, 2026, 12:16 p.m.