Triple

T27344175
Position Surface form Disambiguated ID Type / Status
Subject LGM-30 Minuteman E684185 entity
Predicate instanceOf P0 FINISHED
Object nuclear weapon delivery system C2426 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear weapon delivery system
Context triple: [LGM-30 Minuteman, instanceOf, nuclear weapon delivery system]
  • A. strategic nuclear weapon
    A strategic nuclear weapon is a high-yield nuclear device designed for long-range delivery against an adversary’s key military, industrial, or political targets to achieve large-scale, war-altering effects.
  • B. nuclear weapon
    A nuclear weapon is a highly destructive explosive device that releases immense energy through nuclear fission, fusion, or a combination of both, causing catastrophic blast, heat, and radiation effects.
  • C. missile launch system
    A missile launch system is an integrated hardware and software framework that prepares, arms, targets, and fires missiles while managing safety, authorization, and trajectory control.
  • D. ballistic missile payload system
    A ballistic missile payload system is the integrated assembly of warheads, guidance interfaces, deployment mechanisms, and protective structures designed to deliver and release destructive or specialized payloads to a designated target along a ballistic trajectory.
  • E. ballistic missile chosen
    A ballistic missile is a guided projectile that is launched into a high, arching trajectory and primarily follows a ballistic path under gravity to deliver a warhead to a distant target.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef1480a76481908684256ddd5bfda3 completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 11:44 a.m.