Triple

T27343571
Position Surface form Disambiguated ID Type / Status
Subject NASA Ames Research Center arc-jet facilities E684172 entity
Predicate instanceOf P0 FINISHED
Object aerothermal test facility C7750 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aerothermal test facility
Context triple: [NASA Ames Research Center arc-jet facilities, instanceOf, aerothermal test facility]
  • A. aerospace testing activity
    An aerospace testing activity is a structured process of evaluating aerospace systems, components, or operations under controlled conditions to verify performance, safety, reliability, and compliance with specified requirements.
  • B. liquid-cooled aero engine
    A liquid-cooled aero engine is an aircraft powerplant that uses a circulating liquid coolant, typically water or glycol, to absorb and dissipate heat from the engine, enabling higher performance and more consistent operating temperatures than air-cooled designs.
  • C. wind tunnel
    A wind tunnel is a controlled testing facility where air is driven past stationary objects to study aerodynamic properties such as lift, drag, and flow behavior.
  • D. ablative thermal protection system
    An ablative thermal protection system is a heat shield that protects a spacecraft by sacrificially charring, melting, and eroding material to absorb and carry away extreme reentry heat.
  • E. testing facility chosen
    A testing facility is a specialized environment equipped with tools, equipment, and procedures designed to systematically evaluate, measure, and validate the performance, safety, or quality of products, systems, or processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef1480a76481908684256ddd5bfda3 completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 11:44 a.m.