Triple

T27343569
Position Surface form Disambiguated ID Type / Status
Subject NASA Ames Research Center arc-jet facilities E684172 entity
Predicate instanceOf P0 FINISHED
Object arc-jet facility C10698 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: arc-jet facility
Context triple: [NASA Ames Research Center arc-jet facilities, instanceOf, arc-jet facility]
  • A. JAXA facility
    A JAXA facility is a physical site operated by the Japan Aerospace Exploration Agency that supports space-related research, development, testing, mission control, or public outreach activities.
  • B. isotope production facility
    An isotope production facility is a specialized installation that generates radioactive or stable isotopes—typically using reactors, cyclotrons, or accelerators—for use in medicine, industry, research, and energy applications.
  • C. command-and-control facility
    A command-and-control facility is a secure, centralized location equipped with communication, monitoring, and decision-support systems used to direct and coordinate operations and resources in real time.
  • D. infrastructure facility chosen
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • E. INFN facility
    An INFN facility is a research and infrastructure site operated by the Italian National Institute for Nuclear Physics, dedicated to experimental and theoretical studies in nuclear, particle, and astroparticle physics and related technologies.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef1480a76481908684256ddd5bfda3 completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 11:44 a.m.