Triple
T27343569
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NASA Ames Research Center arc-jet facilities |
E684172
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | arc-jet facility |
C10698
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: arc-jet facility Context triple: [NASA Ames Research Center arc-jet facilities, instanceOf, arc-jet facility]
-
A.
JAXA facility
A JAXA facility is a physical site operated by the Japan Aerospace Exploration Agency that supports space-related research, development, testing, mission control, or public outreach activities.
-
B.
isotope production facility
An isotope production facility is a specialized installation that generates radioactive or stable isotopes—typically using reactors, cyclotrons, or accelerators—for use in medicine, industry, research, and energy applications.
-
C.
command-and-control facility
A command-and-control facility is a secure, centralized location equipped with communication, monitoring, and decision-support systems used to direct and coordinate operations and resources in real time.
-
D.
infrastructure facility
chosen
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
E.
INFN facility
An INFN facility is a research and infrastructure site operated by the Italian National Institute for Nuclear Physics, dedicated to experimental and theoretical studies in nuclear, particle, and astroparticle physics and related technologies.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef1480a76481908684256ddd5bfda3 |
completed | April 27, 2026, 7:47 a.m. |
Created at: April 27, 2026, 11:44 a.m.