Triple
T2732833
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Methil Power Station (former) |
E60354
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | coal-fired power station |
C10893
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: coal-fired power station Context triple: [Methil Power Station (former), instanceOf, coal-fired power station]
-
A.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
B.
wind power plant
A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
-
C.
steam-generating boiler
A steam-generating boiler is an enclosed vessel in which water is heated—typically by burning fuel or using other heat sources—to produce pressurized steam for power generation, heating, or industrial processes.
-
D.
wind power facility
A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
-
E.
steam pumping station
A steam pumping station is an industrial facility that uses steam-powered engines to drive pumps for moving water or other fluids, typically for municipal water supply, drainage, or industrial processes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b75cd908190b691ef0d1801acda |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:56 p.m.