Triple
T2731616
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Orongo ceremonial village |
E60327
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stone settlement |
C4488
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stone settlement Context triple: [Orongo ceremonial village, instanceOf, stone settlement]
-
A.
oasis settlement
An oasis settlement is a community established around a natural water source in an otherwise arid or desert region, relying on the oasis for agriculture, trade, and habitation.
-
B.
historical settlement
chosen
A historical settlement is a once-inhabited place of past human residence whose physical remains, records, and cultural traces provide evidence of earlier social, economic, and political life.
-
C.
Human settlement
A human settlement is a community where people live and interact, ranging in scale from small villages to large cities, characterized by organized habitation, infrastructure, and social structures.
-
D.
coastal settlement
A coastal settlement is a community established along a sea or ocean shoreline, whose location, economy, and culture are strongly influenced by the adjacent marine environment.
-
E.
walled plain
A walled plain is a large, relatively flat-floored lunar impact crater whose low, eroded rim forms an enclosing “wall” around the interior basin.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b75cd908190b691ef0d1801acda |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:56 p.m.