Triple

T27263879
Position Surface form Disambiguated ID Type / Status
Subject Empresas Públicas de Medellín E687842 entity
Predicate majorProject P12153 FINISHED
Object La Sierra thermal power plant
La Sierra thermal power plant is a major thermoelectric generation facility in Colombia that supplies power to the national grid as part of Empresas Públicas de Medellín’s energy portfolio.
E1762773 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: La Sierra thermal power plant | Statement: [Empresas Públicas de Medellín, majorProject, La Sierra thermal power plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: La Sierra thermal power plant
Triple: [Empresas Públicas de Medellín, majorProject, La Sierra thermal power plant]
Generated description
La Sierra thermal power plant is a major thermoelectric generation facility in Colombia that supplies power to the national grid as part of Empresas Públicas de Medellín’s energy portfolio.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef3557abc481908bf3c146f0f3356a completed April 27, 2026, 10:07 a.m.
NER Named-entity recognition batch_69f626f1fcec81909c542acb032e81fb completed May 2, 2026, 4:31 p.m.
NED1 Entity disambiguation (via context triple) batch_6a126287a38081909c63fbe3c0bbbbea completed May 24, 2026, 2:29 a.m.
NEDg Description generation batch_6a1263c16b7c8190bf1e6d9a48f04e79 completed May 24, 2026, 2:34 a.m.
NED2 Entity disambiguation (via description) batch_6a12645e001081909536516633a422a9 completed May 24, 2026, 2:37 a.m.
Created at: April 27, 2026, 10:54 a.m.