Triple

T272540
Position Surface form Disambiguated ID Type / Status
Subject Lotus Notes E5666 entity
Predicate instanceOf P0 FINISHED
Object calendar software C227 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: calendar software
Context triple: [Lotus Notes, instanceOf, calendar software]
  • A. software chosen
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • B. future event
    A future event is an occurrence or happening that has not yet taken place but is anticipated or predicted to occur at a later time.
  • C. organization
    An organization is a structured group of people and resources coordinated to achieve shared goals or perform specific functions.
  • D. public holiday
    A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
  • E. company
    A company is an organized entity, legally recognized or informally structured, that coordinates people and resources to produce goods or services for customers, typically in pursuit of profit or specific objectives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25853594c8190b05ec3a586ec88bf completed Feb. 28, 2026, 2:52 a.m.
Created at: Feb. 28, 2026, 2:57 a.m.