Triple
T271516
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | TriMet Board of Directors |
E5643
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public transit agency governing board |
C172
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public transit agency governing board Context triple: [TriMet Board of Directors, instanceOf, public transit agency governing board]
-
A.
public transportation agency
A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
-
B.
mass transit operator
A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
board of trustees
A board of trustees is a governing body of individuals legally entrusted with overseeing an organization’s mission, assets, and strategic direction on behalf of its stakeholders or beneficiaries.
-
E.
governing body
chosen
A governing body is an organized group of individuals with the authority and responsibility to make decisions, set policies, and oversee the direction and management of an institution, community, or state.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a25853594c8190b05ec3a586ec88bf |
completed | Feb. 28, 2026, 2:52 a.m. |
Created at: Feb. 28, 2026, 2:57 a.m.