Triple

T2709765
Position Surface form Disambiguated ID Type / Status
Subject Gulf of Khambhat E59829 entity
Predicate proposedProjectSite P7849 FINISHED
Object Kalpasar project
The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
E289499 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kalpasar project | Statement: [Gulf of Khambhat, proposedProjectSite, Kalpasar project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kalpasar project
Context triple: [Gulf of Khambhat, proposedProjectSite, Kalpasar project]
  • A. Priyadarshini Jurala Project
    Priyadarshini Jurala Project is a major multipurpose irrigation and hydroelectric dam project on the Krishna River in Telangana, India.
  • B. Upper Krishna Project
    The Upper Krishna Project is a major irrigation and hydroelectric development scheme in Karnataka, India, designed to utilize the waters of the Krishna River for agricultural, power generation, and drinking water purposes.
  • C. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • D. Narmada Dam project
    The Narmada Dam project is a large and controversial river development and hydroelectric scheme in India, widely debated for its environmental and social impacts, including displacement of local communities.
  • E. Kanchrapara
    Kanchrapara is a town in the North 24 Parganas district of West Bengal, India, known historically for its railway workshop and suburban connectivity to Kolkata.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Kalpasar project
Triple: [Gulf of Khambhat, proposedProjectSite, Kalpasar project]
Generated description
The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kalpasar project
Target entity description: The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
  • A. Priyadarshini Jurala Project
    Priyadarshini Jurala Project is a major multipurpose irrigation and hydroelectric dam project on the Krishna River in Telangana, India.
  • B. Upper Krishna Project
    The Upper Krishna Project is a major irrigation and hydroelectric development scheme in Karnataka, India, designed to utilize the waters of the Krishna River for agricultural, power generation, and drinking water purposes.
  • C. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • D. Narmada Dam project
    The Narmada Dam project is a large and controversial river development and hydroelectric scheme in India, widely debated for its environmental and social impacts, including displacement of local communities.
  • E. Kanchrapara
    Kanchrapara is a town in the North 24 Parganas district of West Bengal, India, known historically for its railway workshop and suburban connectivity to Kolkata.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: proposedProjectSite
Context triple: [Gulf of Khambhat, proposedProjectSite, Kalpasar project]
  • A. constructionSite
    Indicates that an entity is a location or area where construction work is actively taking place or is planned to occur.
  • B. isSiteOf chosen
    Indicates that a location or place serves as the setting or host for a particular event, activity, or feature.
  • C. plannedFacility
    Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
  • D. architecturalProject
    Indicates that one entity is an architectural project associated with, created by, or undertaken for another entity.
  • E. eligibleProject
    Indicates that a project satisfies the required conditions or criteria to qualify for a particular status, process, or benefit.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4ac92a088190bc74bca14038e3de completed March 6, 2026, 9:44 p.m.
NER Named-entity recognition batch_69abda7771a4819081904bd6b818b81b completed March 7, 2026, 7:57 a.m.
NED1 Entity disambiguation (via context triple) batch_69afaf7f99508190acfd00baec64b7e9 completed March 10, 2026, 5:43 a.m.
NEDg Description generation batch_69afb02d8ff08190af2224c03b762c68 completed March 10, 2026, 5:46 a.m.
NED2 Entity disambiguation (via description) batch_69afb0afc4148190b96337f66b77fe28 completed March 10, 2026, 5:48 a.m.
PD Predicate disambiguation batch_69abd8224c688190bb4a362360b03007 completed March 7, 2026, 7:47 a.m.
Created at: March 6, 2026, 9:55 p.m.