Triple
T27078720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thomas S. Bullock |
E685533
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railroad entrepreneur |
C7593
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railroad entrepreneur Context triple: [Thomas S. Bullock, instanceOf, railroad entrepreneur]
-
A.
railroad magnate
chosen
A railroad magnate is a powerful and wealthy business leader who controls, develops, and profits from major railway enterprises and infrastructure.
-
B.
railroad pioneer
A railroad pioneer is an early visionary, engineer, or entrepreneur who played a foundational role in conceiving, building, or expanding railway systems, often overcoming significant technical, financial, and social obstacles.
-
C.
railroad syndicate
A railroad syndicate is a consortium of investors, financiers, or companies that collaborate to fund, construct, control, or operate railroad lines, often to consolidate power, reduce competition, or coordinate large-scale rail projects.
-
D.
railway construction company
A railway construction company is an organization that plans, designs, and builds railway infrastructure, including tracks, stations, bridges, and related systems, often coordinating engineering, procurement, and project management activities.
-
E.
freight railroad company
A freight railroad company is an organization that owns or operates rail infrastructure and rolling stock to transport goods and commodities by train between industrial, commercial, and logistics locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef14843b1481909d828b3d5a44550a |
completed | April 27, 2026, 7:47 a.m. |
Created at: April 27, 2026, 8:33 a.m.