Triple
T27010424
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | road links to Ibagué |
E680368
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ground transportation link |
C52378
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ground transportation link Context triple: [road links to Ibagué, instanceOf, ground transportation link]
-
A.
ground transportation facility
A ground transportation facility is a designated location that supports the movement, transfer, and management of passengers or goods via land-based modes such as buses, trains, cars, or trucks.
-
B.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
public transport bridge
A public transport bridge is a dedicated crossing structure designed primarily for buses, trams, trains, or other mass transit vehicles to traverse obstacles such as rivers, roads, or valleys efficiently and safely.
-
E.
road transport node
A road transport node is a specific location within a road network where vehicles and travelers converge, diverge, or transfer, such as intersections, terminals, or hubs.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeeb53939c8190bd431f32b060f01f |
completed | April 27, 2026, 4:51 a.m. |
Created at: April 27, 2026, 7:02 a.m.