Triple

T27004347
Position Surface form Disambiguated ID Type / Status
Subject Bute Dock Company E680200 entity
Predicate instanceOf P0 FINISHED
Object dock company C33268 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: dock company
Context triple: [Bute Dock Company, instanceOf, dock company]
  • A. ship management company
    A ship management company is an organization that oversees the technical, crewing, operational, and commercial management of vessels on behalf of ship owners to ensure safe, efficient, and compliant maritime operations.
  • B. container shipping company
    A container shipping company is a business that transports standardized cargo containers across oceans and other waterways using a fleet of specialized vessels, managing logistics, routing, and port operations.
  • C. maritime transport company
    A maritime transport company is an organization that operates ships and related logistics to move cargo and/or passengers across seas and oceans between ports.
  • D. maritime services company chosen
    A maritime services company provides specialized support and solutions for the shipping and marine industries, such as vessel operations, logistics, maintenance, and marine consultancy.
  • E. ore dock
    An ore dock is a specialized waterfront structure used for the storage, handling, and loading of bulk ore from rail or conveyor systems onto ships for transport.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeeb52908c8190bd246244686aa455 completed April 27, 2026, 4:51 a.m.
Created at: April 27, 2026, 7 a.m.