Triple
T270035
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Clinton Engineer Works |
E5611
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Manhattan Project facility |
C702
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Manhattan Project facility Context triple: [Clinton Engineer Works, instanceOf, Manhattan Project facility]
-
A.
research facility
A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
-
B.
military installation
A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
-
C.
nuclear weapons program
A nuclear weapons program is an organized, often state-led effort to research, develop, test, produce, and maintain nuclear warheads and their delivery systems for military deterrence or potential use.
-
D.
World War II site
chosen
A World War II site is a historically significant location directly associated with events, operations, or impacts of the Second World War, preserved or recognized for its cultural, military, or memorial value.
-
E.
United States Army installation
A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a25853594c8190b05ec3a586ec88bf |
completed | Feb. 28, 2026, 2:52 a.m. |
Created at: Feb. 28, 2026, 2:57 a.m.