Triple
T2699172
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hong Kong–Zhuhai–Macau Bridge |
E58588
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sea-crossing bridge–tunnel system |
C4842
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sea-crossing bridge–tunnel system Context triple: [Hong Kong–Zhuhai–Macau Bridge, instanceOf, sea-crossing bridge–tunnel system]
-
A.
cross-sea bridge
chosen
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
B.
suspension bridge
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
C.
toll bridge
A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
-
D.
highway bridge
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
-
E.
double-decked bridge
A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4ac269e481909cb317d79e68b75b |
completed | March 6, 2026, 9:44 p.m. |
Created at: March 6, 2026, 9:55 p.m.