Triple

T26813482
Position Surface form Disambiguated ID Type / Status
Subject SOLID principles E672060 entity
Predicate instanceOf P0 FINISHED
Object software design principle set C15482 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software design principle set
Context triple: [SOLID principles, instanceOf, software design principle set]
  • A. software design pattern
    A software design pattern is a reusable, generalized solution to a common problem in software design that provides a proven structure for organizing code and interactions.
  • B. software engineering guideline chosen
    A software engineering guideline is a documented recommendation or best practice that directs how software should be designed, developed, tested, and maintained to ensure quality, consistency, and efficiency.
  • C. open-source software development principle
    An open-source software development principle is a guiding rule or value that promotes transparent, collaborative, and freely accessible creation, modification, and distribution of software and its source code.
  • D. set of draft principles
    A set of draft principles is a provisional collection of guiding rules or standards formulated for review, discussion, and potential refinement before final adoption.
  • E. design philosophy
    Design philosophy is the underlying set of principles, values, and beliefs that guide how and why design decisions are made.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeb3225a3c8190aaf6746efeded2f3 completed April 27, 2026, 12:51 a.m.
Created at: April 27, 2026, 4:30 a.m.