Triple

T2679495
Position Surface form Disambiguated ID Type / Status
Subject Long Walls E56540 entity
Predicate instanceOf P0 FINISHED
Object military infrastructure C1086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military infrastructure
Context triple: [Long Walls, instanceOf, military infrastructure]
  • A. military installation chosen
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • B. military structure
    A military structure is an organized framework of ranks, units, and command relationships that defines how armed forces are arranged, governed, and coordinated to conduct operations.
  • C. military buildup
    A military buildup is the systematic expansion and strengthening of a nation's armed forces, weaponry, and defense infrastructure to increase its military capability and strategic influence.
  • D. military technology
    Military technology encompasses the specialized tools, systems, and innovations developed and used by armed forces to enhance their capabilities in defense, offense, intelligence, and logistics.
  • E. military fortification system
    A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4b13fc81909dfdb3f23da46832 completed March 6, 2026, 9:42 p.m.
Created at: March 6, 2026, 9:54 p.m.